OEM / ODM Export

Shipping &
Compliance

Oursun supports global B2B partners with full export documentation, hazardous goods compliance, and reliable production lead times -- ensuring your order moves from factory to port without friction.

Standard Production Lead Time
30 - 35 Business Days
From order confirmation to ex-factory readiness · Subject to order volume & SKU mix
Hazardous Goods

UN2794 Classification & Transport Compliance

Wet lead-acid batteries (filled with electrolyte) are classified as Class 8 Corrosive Dangerous Goods under international transport regulations. Oursun ensures all export shipments are packaged, labeled, and documented in full compliance with applicable standards.

UN Number & Class

UN Number UN 2794
Hazard Class Class 8 -- Corrosive
Packing Group III
Proper Shipping Name Batteries, wet, filled with acid, electric storage

Applicable Regulations

  • IMDG Code
    International Maritime Dangerous Goods (sea freight)
  • IATA DGR
    Dangerous Goods Regulations (air freight -- restricted)
  • ADR / RID
    European road & rail dangerous goods transport
  • China GB Standards
    Domestic export packaging & labeling compliance

Packaging & Labeling

  • UN-certified outer carton / wooden pallet packaging
  • Class 8 corrosive hazmat diamond label on each carton
  • "This Way Up" orientation arrows on all packages
  • OEM/ODM custom outer box & pallet labeling available
  • Electrolyte fill level sealed & vent caps secured pre-shipment
Order Timeline

Production & Delivery Lead Time

Our standard B2B production cycle runs 30 to 35 business days from order confirmation. Below is a typical OEM/ODM order flow for reference.

1
Day 1

Order Confirmation

PI signed, deposit received, technical specs & artwork locked

2
Day 2-5

Material & Schedule

Raw material procurement, production scheduling & line allocation

3
Day 6-28

Production & QC

In-process quality control, formation, capacity testing & OQC inspection

4
Day 29-33

Packing & Docs

Custom packaging, hazmat labeling & all export documents prepared

5
Day 34-35

Ex-Factory / FOB

Goods ready at Ganzhou factory gate or delivered to Shenzhen / Guangzhou port

Lead Time Notes
  • Lead time is calculated from the date of confirmed PI + deposit receipt. Actual timeline may vary based on order volume, SKU complexity, and seasonal factory load.
  • OEM/ODM orders with custom tooling, new molds, or first-article approval may require additional 5-10 days for sample sign-off before mass production begins.
  • Oursun's 50,000 units/day capacity ensures consistent on-time delivery for large-volume B2B orders.
Documentation

Export Trade Documents

Oursun provides a complete set of export and compliance documents for every B2B shipment, facilitating smooth customs clearance at the destination port.

Standard Commercial Documents

Commercial Invoice
Itemized pricing, buyer/seller details, Incoterms, currency
Standard
Packing List
Carton count, gross/net weight, dimensions, pallet configuration
Standard
Certificate of Origin (COO)
China-origin certification; Form E (ASEAN), Form A, or general COO available upon request
Standard
Bill of Lading (B/L)
Ocean B/L or Seaway Bill issued by the nominated freight forwarder
Standard
Quality Inspection Report
OQC outgoing inspection results including CCA, capacity, internal resistance per batch
Standard

Hazmat & Compliance Documents

SDS / MSDS
Safety Data Sheet for wet lead-acid batteries; available in English, French, Spanish, Arabic
On Request
Dangerous Goods Declaration (DGD)
Shipper's DGD per IMDG Code requirements for sea freight Class 8 shipments
Included
Test Reports & Certifications
IATF 16949, ISO 9001, ISO 14001, CCS type approval; third-party lab reports available
On Request
Batch Traceability Record
Production date code, batch number, and QC data linkage for full lot traceability
Included
Phytosanitary / Fumigation Certificate
For wooden pallet shipments requiring ISPM 15 compliance (Australia, EU, US, etc.)
On Request
Trade Terms

Supported Incoterms

Oursun is flexible on trade terms. The following Incoterms 2020 are available depending on order size and destination market.

EXW
Ex Works
Ganzhou Factory Gate
FOB
Free On Board
Shenzhen / Guangzhou
CIF
Cost, Insurance & Freight
Destination Port
CFR
Cost & Freight
Destination Port
Logistics

Container & Shipping Modes

Lead-acid batteries are primarily shipped by sea. Oursun provides container loading guidance and coordinates with certified DG freight forwarders.

FCL -- Full Container Load
20' GP or 40' GP containers; standard for large-volume OEM orders. Loading plan & weight distribution provided.
LCL -- Less than Container Load
Available for smaller trial orders or mixed SKU shipments. DG-LCL consolidation with certified co-loaders.
Nearest Export Ports
Shenzhen Yantian / Shekou, Guangzhou Nansha. Transit time from factory to port: approx. 4-6 hours.

Note: Wet lead-acid batteries (UN2794) are generally prohibited on passenger aircraft. Sea freight is the standard and recommended mode. Road/rail options available for regional markets (EU/Middle East) via ADR-certified carriers.

OEM / ODM

OEM & ODM Export Support

Oursun provides end-to-end OEM and ODM export solutions -- from custom branding and packaging to compliance documentation tailored to your destination market.

Private Label & Branding

Custom battery label, brand name, logo, and color scheme. Supports multi-brand matrix for different regional markets.

Custom Packaging

Branded outer carton, insert design, master carton labeling, and pallet configuration per buyer specification.

Spec & SKU Customization

Voltage, capacity (Ah), CCA, terminal layout, case size, and DIN/JIS/BCI fitment customized per buyer requirements.

Compliance & Market Docs

Market-specific documentation support including EU Battery Regulation readiness, REACH, RoHS, and regional import compliance advisory.

Loading Guide

Pallet & Container Loading Reference

Standard pallet and container loading data to assist your logistics and customs planning. Exact figures vary by product series and SKU -- please request a specific loading plan with your RFQ.

Standard Pallet
Pallet Size 1200 × 1000 mm
Standard ISPM 15 Compliant
Units per Pallet Varies by SKU
Stretch Wrap Standard
20' GP Container
Internal Volume ~33 CBM
Max Payload ~21,700 kg
Pallets ~10-11 pallets
DG Stowage Category A/B
40' GP Container
Internal Volume ~67 CBM
Max Payload ~26,700 kg
Pallets ~20-22 pallets
Recommended For Large OEM orders

* Container loading figures are approximate reference values. Actual unit quantities depend on battery series, case dimensions, and stacking configuration. Oursun's export team will provide a detailed loading plan (with 3D stowage diagram) upon order confirmation.

Ready to Ship

Start Your Export Order Today

Submit your RFQ and our export team will respond within 24 hours with pricing, lead time confirmation, and a full documentation checklist for your destination market.

30+
Export Countries
50K
Units / Day Capacity
30-35
Day Lead Time
24H
RFQ Response